Schlossberghalle: Next major renovation. The flat roof over the large hall, small hall and foyer needs to be replaced.

The reasons for this go back to the 1990s. An exact schedule has not yet been determined. So far, the city would like to provide a total of 2.2 million euros between 2025 and 2027. Dr. Franz Sengl (Greens) suggested considering the installation of a photovoltaic system instead of rebuilding the green roof.