The Limited Times

Fiera Hospital, there are conditions

3/16/2020, 5:46:51 PM


"I had a meeting with Dr. Bertolaso ​​and his technicians, there is the maximum availability to build this structure, on the horizon there are the conditions to arrive at a positive solution and a quick solution": said the president ... (ANSA)

(ANSA) - MILAN, MAR 16 - "I had a meeting with Dr. Bertolaso ​​and his technicians, there is the maximum availability to create this structure, on the horizon there are the conditions to arrive at a positive solution and a quick solution" : said the president of the Lombardy Region AttilioFontana speaking from inside the Fiera di Milano where a hospital with 400 intensive care units could be built. "This will be a point of reference for the whole country," he added. "We are in contact with Commissioner Arcuri and with Minister Speranza, we have presented our project and Arcuri will tell us tomorrow in chemodo and with what entity of machinery he will be able to collaborate with us", added Fontana. The hospital could be developed on two floors, one of 12 thousand square meters and another of 13 thousand square meters and, as far as the machinery is concerned, Fontana reiterated that "we are also reasoning with foreign companies".