Hama-Sana
The city council of Hama finished the work of restoring and rehabilitating the bridge bridge at the entrance to Umm Al Hassan Park from the southern side of the city center, which started two months ago.
He pointed out that the corona has also been completely replaced by using eucalyptus, walnut and pine wood, explaining that these works were carried out by a specialized workshop that includes designing and implementing wooden figures that match worn pieces of the same length and size and treating them with insulating materials to increase their durability and resistance to weather changes and then install them on the body of the hemophilia in a sequential and regular manner.
It is one of the largest water pipes in Hama, and it was exposed as a result of weather factors and interruption of Orontes water for intermittent periods of damage to its wood, which led to its cracking and parts of it falling.
Follow the latest news on the Telegram application on smartphones via the link:
https://telegram.me/SyrianArabNewsAgency
Follow our page on the social networking site VK at:
http://vk.com/syrianarabnewsagency