The Limited Times

Now you can see non-English news...

The implementation of the first phase of the optical Internet project in the city of Tartus

2019-12-18T14:35:06.416Z


Tartus-SANA The technical workshops in the Syrian Telecom Company branch in Tartous have completed the implementation of the first phase of a project


Tartus-Sana

The technical workshops in the Syrian Telecom Company branch in Tartous have completed the implementation of the first phase of the project "FTTH" optical data transmission technology to deliver the Internet to homes and offices at high speeds in the Mina and Al Thawra streets in Tartus.

The engineer, Badie Wannous, the manager of the company’s branch, said in a statement to Sana’s correspondent that the number of requests to benefit from the service reached about 70 requests within the city of Tartous.

Wannous pointed out that this service ensures that the subscriber can access the Internet at speeds between 8 and 16 megabytes in real terms and without loss, as happens in the case of copper cable, explaining that the prices paid by the subscriber for this service are logical and acceptable in exchange for ensuring that he gets an actual and real internet service.

He noted that the determinants of participation in the service depend on the citizen’s desire to obtain it, as the public administration is addressed to make the necessary equipment and infrastructure and make it available to those who wish to obtain it.

Follow the latest news on the Telegram application on smartphones via the link:

https://telegram.me/SyrianArabNewsAgency

Follow our page on the (VK) social networking site:

http://vk.com/syrianarabnewsagency

Source: sena

All news articles on 2019-12-18

You may like

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.