The Limited Times

Now you can see non-English news...

Putting a well in Rahiba in Damascus countryside for service

2022-03-21T20:33:32.398Z


Rural Damascus, SANA- The General Corporation for Drinking Water and Sanitation in Damascus and its countryside has installed well 19 in the city of Rahiba.


Rif Dimashq-SANA

The Public Establishment for Drinking Water and Sanitation in Damascus and its countryside put well 19 in the city of Rahiba in Damascus countryside into service.

Engineer Wissam Baroudi, director of the economic units in the corporation, explained in a statement to SANA that the well is located in the upper Shamees Al-Rahiba project, at a density of 38 cubic meters per hour, and at a depth of 370 meters.

Baroudi indicated that the Corporation dug two exploratory wells in the Al-Zour area in the Damascus countryside, the first with a depth of 400 meters and an abundance of 25 cubic meters per hour, and the second with a depth of 365 meters and a depth of 45 cubic meters per hour so that the two wells can be equipped and electric current is secured for them to put them into service as soon as possible.

Baroudi pointed out that last year, the Foundation put well 17 into service in the Shamees Al-Rahiba Upper Project.

Tariq Al-Sayed

Source: sena

All news articles on 2022-03-21

Similar news:

You may like

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.